Project Scope
What we delivered
Road construction including earthwork, sub-grade preparation, GSB, WMM, DBM and BC layers as per IRC/MORTH specifications. Drainage engineering, kerb stone installation and road marking.
IRCStandards
MORTHSpec
12moDuration
Methodology
Layer-by-layer pavement construction with compaction testing at each stage. Proctor density verification. DBM and BC laid with paver finisher. Quality controlled to IRC standards throughout.
⚑ Replace with actual project photos. Upload real site/completion photos for this project to build client trust.
Need something similar?
We deliver infrastructure projects with BOQ-driven costing and baseline scheduling.